Selected Project Deliveries

Guyana

43 Distribution Units for a Guyana Industrial-Park Upgrade

For a distribution network upgrade at an industrial and commercial park in Guyana, the equipment needed to account for a humid, rainy tropical environment. Moisture, corrosion and condensation were therefore key considerations in preparing the supply package. The order comprised six power distribution cabinets and thirty-seven distribution boxes, with specific improvements to the enclosures to address these conditions. English technical drawings and factory-test reports were prepared alongside the equipment to support communication with the customer’s project team.

All forty-three units completed factory testing and were shipped in August 2026. The service scope also included remote technical guidance and maintenance coordination with local service providers, extending support beyond factory release and dispatch. By combining environmental adaptations with technical documentation and an after-sales support arrangement, the project addressed the customer’s equipment requirements while also preparing for subsequent technical assistance.

Delivery
August 2026
Application
Industrial-park distribution upgrade
Equipment
6 distribution cabinets and 37 distribution boxes
Project support
English technical documents, factory testing and remote guidance
Indonesia

28-Unit Distribution Package for an Indonesian Industrial Park

An industrial park in Indonesia needed a coordinated package of switchgear, control cabinets and transformers for a power distribution network upgrade. Tropical heat and humidity made moisture protection and corrosion resistance important considerations in the equipment configuration. In response, we supplied five 10 kV switchgear units, twenty low-voltage control cabinets and three distribution transformers, bringing the principal equipment categories together within one supply package. The equipment received moisture-resistant and anti-corrosion treatments, supported by Chinese and English technical documentation.

The complete order underwent factory inspection and testing before being dispatched from Qingdao Port in March 2026. Along with the equipment and factory-test reports, the customer received 18-month warranty coverage, access to remote technical guidance and after-sales maintenance coordination with local partners. This combination of manufacturing, documentation and technical support provided a clear basis for cooperation beyond the shipment itself.

Delivery
March 2026
Application
Industrial-park grid upgrade
Equipment
5 × 10 kV switchgear panels, 20 LV control cabinets and 3 distribution transformers
Project support
Chinese- and English-language technical documents, factory-test reports, remote guidance and an 18-month warranty
Mozambique

Transformers and Low-Voltage Cabinets for an Industrial Park

An industrial park power distribution project in Mozambique required transformers and low-voltage control equipment suited to tropical humidity and salt exposure. Addressing these conditions was an important part of the supply scope, which comprised two distribution transformers and six low-voltage control cabinets. Our technical team incorporated moisture-resistant measures and corrosion protection into the equipment, adapting the package to the project’s operating environment.

Technical communication was supported by English and Portuguese drawings and test reports, making the project information accessible across the customer’s teams. After completing factory inspection and testing, the equipment was shipped to Mozambique in September 2025. The service package also included remote technical guidance and maintenance coordination with local partners, giving the customer a channel for technical assistance after shipment. Together, the equipment adaptations, bilingual documentation and coordinated support addressed both the supply requirements and the practical needs of an overseas project.

Delivery
September 2025
Application
Industrial-park distribution project
Equipment
2 distribution transformers and 6 low-voltage control cabinets
Project support
Bilingual technical documents, factory testing and remote guidance
Angola

20 Distribution Transformers for Angola Grid Upgrades

For municipal grid and industrial park upgrades in Angola, the customer required twenty distribution transformers manufactured to specified French NF C 52-100 requirements. The project combined requirements for losses, temperature rise and protection with the need to withstand tropical heat, humidity and coastal salt exposure. These considerations shaped both the transformer configuration and the supporting technical documentation.

To address the requirements, we adapted the core and winding design, insulation system, and temperature monitoring and protection components, while enhancing corrosion protection for the intended operating environment. The supply also included multifunction transformer protection devices. Each transformer underwent factory testing covering no-load losses, temperature rise, dielectric withstand and leak tightness, with test reports prepared to document the results.

Production, factory testing and containerized shipment were completed in June 2025. Alongside the equipment, the project package included factory-test reports and French-language drawings, with installation guidance and remote operation and maintenance support included in the service scope. This approach connected the customer’s technical requirements with equipment configuration, documented testing and practical support after shipment.

Delivery
June 2025
Application
Municipal-grid and industrial-park upgrades
Equipment
20 distribution transformers
Project support
NF C 52-100 and specified C5-M corrosion protection, French-language drawings and factory-test records
Pakistan

Eight Switchgear and Control Panels for a Pakistan Industrial Park

For an industrial park in Pakistan, upgrading the power distribution network meant selecting equipment suited to both the project’s electrical requirements and its hot, dusty operating environment. We supplied three 10 kV switchgear units and five low-voltage control cabinets, with targeted improvements to enclosure protection, heat dissipation and sealing. These measures addressed the environmental conditions the equipment would face, while English technical drawings and factory-test reports provided the customer’s project team with supporting information for technical review.

Following factory testing, the complete eight-cabinet package was dispatched from Qingdao Port in April 2025. Support extended beyond shipment, with remote technical guidance and maintenance coordination through local service partners included in the service scope. The project brought equipment supply, technical documentation and after-sales coordination together to support the customer’s distribution upgrade.

Delivery
April 2025
Application
Industrial-park distribution project
Equipment
3 × 10 kV switchgear panels and 5 low-voltage control cabinets
Project support
English technical documents, factory testing and remote guidance

Earlier Project Records

Earlier deliveries are presented in a compact format where the available project record contains fewer details.

Zimbabwe

March 2020

Three transformers and three matching accessory sets for municipal-grid upgrades and industrial power supply.

Equipment
3 transformers and 3 accessory sets
Support
Factory checks, technical records, installation guidance and remote support

Mozambique

2018 & 2020

Two deliveries of transformers and medium- and low-voltage switchgear for park distribution and infrastructure projects.

2018
3 MV switchgear panels and 1 distribution transformer
2020
5 × 10 kV HXGN panels, 3 transformers and 10 LV panels

Ghana

2018

Two HXGN-40.5 ring main units supplied for a local grid upgrade.

Equipment
2 × HXGN-40.5 ring main units
Voltage class
35 kV
Checks
Withstand-voltage and protection-interlocking checks

Indonesia

2018

Three HXGN-40.5 ring main units supplied for an island-grid application.

Equipment
3 × HXGN-40.5 ring main units
Voltage class
35 kV
Checks
Withstand-voltage and relay-protection checks

Planning a power-distribution project?

Send your voltage level, equipment list, applicable standard, destination conditions and required delivery date for a project-specific quotation.

Request a Free Quote